Pictures

Below you find pictures with details from various stages of our activity.

Laying out of PTAB (Transforming Post in Concrete Jacket) 1x 630 kVA DG2061 for Latin Residence on Prelungirea Ghencea street in Bucharest 2017
Laying out of PTAB (Transforming Post in Concrete Jacket) 1x 630 kVA DG2061 for Latin Residence on Prelungirea Ghencea street in Bucharest 2017

Laying out PTAB in Bucharest 2018
Laying out PTAB in Bucharest 2018

 

Telecontrol system mounted in rack in Bucharest 2018
Telecontrol system mounted in rack in Bucharest 2018
Medium voltage cells in Bucharest 2018
Medium voltage cells in Bucharest 2018
Voltage transforming unit in Bucharest 2018
Voltage transforming unit in Bucharest 2018
Laying out FDCP (Tier Distributing Counting Niche) within the project executed for Avangarde City Bucharest 2018
Laying out FDCP (Tier Distributing Counting Niche) within the project executed for Avangarde City Bucharest 2018
Rigging of PTAB with low voltage switches in Bucharest 2017
Rigging of PTAB with low voltage switches in Bucharest 2017
Assembling of supply box equipped with electric energy transforming kit 125/5 A in Bucharest, march 2018
Assembling of supply box equipped with electric energy transforming kit 125/5 A in Bucharest, march 2018
Double street box equipped with 4 way sectional clamps in Bucharest, march 2018
Double street box equipped with 4 way sectional clamps in Bucharest, march 2018
Rigging of PTAB with low voltage switches in Bucharest, march 2018
Rigging of PTAB with low voltage switches in Bucharest, march 2018
Street box equipped with 4 way sectional clamps in Bucharest, march 2018
Street box equipped with 4 way sectional clamps in Bucharest, march 2018